Submission Monitoring Dashboard

Region VII · Division of Bohol · Division → Congressional District → District → School submission tracking
Total Expected289
With Any Submission233
80.6% submission rate
Complete168
58.1% fully complete
Incomplete65
No Submission56
Overdue0
Districts 100% Submitted7 / 15
Districts Complete4 / 15
Show No Submission Export CSV

3 Congressional District Submission Comparison

Division-wide comparison for 2026-2027 / Term 1 · All Required Reports. School, district, keyword, and status searches do not limit this comparison.
Highest Submission Percentage2nd Congressional District — 89.7%
Congressional Districts at 100% Submission0 / 3

1st Congressional District

233 of 289 expected schools with submission
80.6%
Submission rate
168Complete
65In Progress
56Missing
Completion rate: 58.1%

2nd Congressional District

419 of 467 expected schools with submission
HIGHEST
89.7%
Submission rate
360Complete
59In Progress
48Missing
Completion rate: 77.1%

3rd Congressional District

392 of 443 expected schools with submission
88.5%
Submission rate
355Complete
37In Progress
51Missing
Completion rate: 80.1%
100% Submission means every active registered school in that Congressional District has at least one submission matching the selected report scope. Completion % remains separate and indicates schools whose required submission status is COMPLETE.

Congressional District Overview

Submission % counts every school with at least one matching submission, even when its submission is still incomplete.
Congressional DistrictExpected SchoolsWith SubmissionCompleteIn ProgressMissingOverdueSubmission %Completion %
1st Congressional District28923316865560
80.6%
58.1%

District Submission Progress

CDDistrictExpectedWith SubmissionCompleteIn ProgressMissingOverdueSubmission %Completion %
1Alburquerque1198120
81.8%
72.7%
1Baclayon161301330
81.3%
0%
1Catigbian331376200
39.4%
21.2%
1Loon North262218440
84.6%
69.2%
1Loon South221641260
72.7%
18.2%
1Maribojoc2616115100
61.5%
42.3%
1Sikatuna1361570
46.2%
7.7%
1Tubigon West18149540
77.8%
50%
1Antequera212117400
100%
81%
1Calape232319400
100%
82.6%
1Dauis171711600
100%
64.7%
1Balilihan202020000
100%
100%
1Corella999000
100%
100%
1Panglao141414000
100%
100%
1Tubigon East202020000
100%
100%

School Submission Matrix — 2026-2027 / Term 1

Grade levels detected from each submitted report are shown below the status. Downloads include all 56 school(s) matching the active filters, including rows outside the scroll area.
56 filtered rows⬇ Download CSV
CDDistrictSchoolQRA / Results AnalysisCIMRLearning Competency AuditMultifactor AnalysisOverall Status
1AlburquerqueDANGAY ELEMENTARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1AlburquerqueHANDUMON ELEM.SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1BaclayonCambanac Primary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1BaclayonCONG. PABLO MALASARTE NATIONAL HIGH SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1BaclayonLIBERTAD✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianAlegria Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianBaang Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianBongbong Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianCambailan Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianCatigbian National High School*✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianCATIGBIAN NATIONLA HS✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianCatigbian West Central Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianCAUSWAGAN ELEMENTARY✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianHAGUILANAN ELEMENTARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianHAGUILANAN ELEMNTARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianLiboron Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianMahayag Norte Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianMaitum Elementary Schhol✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianMaitum Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianRizal eElementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianSINAKAYANAN ELEMENTARY✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianSINAKAYANAN ELEMENTRY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianTriple Union Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianValeriano Segura Memorial Elementary✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1CatigbianValeriano Segura Mewmorial Elem. School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Loon NorthCabilao National High School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Loon NorthGov. Jacinto Borja National High School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Loon NorthInabanga North Central Integrated School - Secondary✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Loon NorthLAWIS ELEMENTARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Loon SouthBasac Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Loon SouthCABUG PRIMARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Loon SouthSto. Rosario Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Loon SouthTubodacu Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Loon SouthTubodio Elementart School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Loon SouthTubodio Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1MaribojocBOOD PRIMARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1MaribojocBusao Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1MaribojocDipatlong Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1MaribojocGUIWANON PRIMARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1MaribojocJandig Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1MaribojocLIBAONG ELEMENTARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1MaribojocMARIBOJOC CENTRAL ES✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1MaribojocPagnitoan National Hogh School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1MaribojocPUNTA CRUZ ELEM.✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1MaribojocSANTA CRUZ ELEMENTARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1SikatunaABUCAY ELEMENTARY✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1SikatunaABUCAY ELEMENTARY SCCHOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1SikatunaABUCAY ELEMENTARY SCCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1SikatunaBADIANG SIKATUNA BOHOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1SikatunaDoljo Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1SikatunaPanglao Central East Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1SikatunaSIKAYUNA NATIONAL HIGH SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Tubigon WestBanlasan Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Tubigon WestCAHAYAG ELEEMENTARY✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Tubigon WestCAHAYAG ELEMENTARY✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
1Tubigon WestPandan Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.

Deadline Configuration

After the deadline, a school with no submission is automatically marked OVERDUE.