Total Expected467
With Any Submission419
89.7% submission rate
Complete360
77.1% fully complete
Incomplete59
No Submission48
Overdue0
Districts 100% Submitted13 / 21
Districts Complete10 / 21
Show No Submission Export CSV

3 Congressional District Submission Comparison

Division-wide comparison for 2026-2027 / Term 1 · All Required Reports. School, district, keyword, and status searches do not limit this comparison.
Highest Submission Percentage2nd Congressional District — 89.7%
Congressional Districts at 100% Submission0 / 3

1st Congressional District

233 of 289 expected schools with submission
80.6%
Submission rate
168Complete
65In Progress
56Missing
Completion rate: 58.1%

2nd Congressional District

419 of 467 expected schools with submission
HIGHEST
89.7%
Submission rate
360Complete
59In Progress
48Missing
Completion rate: 77.1%

3rd Congressional District

392 of 443 expected schools with submission
88.5%
Submission rate
355Complete
37In Progress
51Missing
Completion rate: 80.1%
100% Submission means every active registered school in that Congressional District has at least one submission matching the selected report scope. Completion % remains separate and indicates schools whose required submission status is COMPLETE.

Congressional District Overview

Submission % counts every school with at least one matching submission, even when its submission is still incomplete.
Congressional DistrictExpected SchoolsWith SubmissionCompleteIn ProgressMissingOverdueSubmission %Completion %
2nd Congressional District46741936059480
89.7%
77.1%

District Submission Progress

CDDistrictExpectedWith SubmissionCompleteIn ProgressMissingOverdueSubmission %Completion %
2Buenavista 1231165120
47.8%
26.1%
2Buenavista 2221511470
68.2%
50%
2Clarin252051550
80%
20%
2Danao332725260
81.8%
75.8%
2Getafe 1191551040
78.9%
26.3%
2Inabanga South241913650
79.2%
54.2%
2San Isidro21178940
81%
38.1%
2Ubay 3292420450
82.8%
69%
2Inabanga North272726100
100%
96.3%
2Pres. Carlos P. Garcia303028200
100%
93.3%
2Ubay 2161615100
100%
93.8%
2Bien Unido191919000
100%
100%
2Dagohoy171717000
100%
100%
2Getafe 2141414000
100%
100%
2Sagbayan282828000
100%
100%
2San Miguel262626000
100%
100%
2Talibon 1212121000
100%
100%
2Talibon 2232323000
100%
100%
2Trinidad 1141414000
100%
100%
2Trinidad 2161616000
100%
100%
2Ubay 1202020000
100%
100%

School Submission Matrix — 2026-2027 / Term 1

Grade levels detected from each submitted report are shown below the status. Downloads include all 48 school(s) matching the active filters, including rows outside the scroll area.
48 filtered rows⬇ Download CSV
CDDistrictSchoolQRA / Results AnalysisCIMRLearning Competency AuditMultifactor AnalysisOverall Status
2Buenavista 1Asinan Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1Asinan Elementary School chool✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1ASINAN ELEMENTRY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1Bago Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1Bantuan Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1Buenavista I Central Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1Buenavista Municipal High✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1Buenavista Municipal Highschool✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1Cambus-oc Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1Lubang Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1Lusong Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 1Nueva Granada Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 2BALUARTE ES✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 2Cangawa Nationsl High School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 2Cangawa Ntional High School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 2DAIT NORTE ELEMENTARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 2LUBANG National High School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 2Magkaya Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Buenavista 2PA✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2ClarinCantoyoc Elementary Dchool✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2ClarinClarin Central Elementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2ClarinClarin Central Elementary Schoolol✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2ClarinClarin Central ElementarySchool✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2ClarinLAJOG ELEMENTARY✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2DanaoCarbon Elememtary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2DanaoDANAO CENRTAL ES✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2DanaoFelix E bompat High School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2DanaoHIBALE ELEMENTARY SCHOOLOLOLOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2DanaoSANTA ANA✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2DanaoTAMING ELEMENTARY✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Getafe 1Banacon Elememntary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Getafe 1Buyog Eementary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Getafe 1Tugas Elementaery School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Getafe 1Tulang National High School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Inabanga SouthBADIANG ELEMENTARY✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Inabanga SouthBadiang Elementary School, Inabanga, Bohol, Philippines✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Inabanga SouthJAGNA CENTRAL ELEMENTARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Inabanga SouthLUYO PRIMAR SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Inabanga SouthSOUTHERN INABANGA HIGH SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2San IsidroSAN ANTONIO✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2San IsidroSAN ISIDRO✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2San IsidroSan Isidro Central Elementary Schoo✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2San IsidroSan Isidro Central Elementary Schoolhol✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Ubay 3Bongbong Elementary Scholl✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Ubay 3BUENAVISTA ELLEMEMNTARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Ubay 3California Elemetary School✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Ubay 3PAG-ASS ELEMENTARY SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.
2Ubay 3SAMPLE SCHOOL✕ NONE✕ NONE✕ NONE✕ NONENO SUBMISSION
Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission
Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion.

Deadline Configuration

After the deadline, a school with no submission is automatically marked OVERDUE.