| Congressional District | Expected Schools | With Submission | Complete | In Progress | Missing | Overdue | Submission % | Completion % |
|---|---|---|---|---|---|---|---|---|
| 3rd Congressional District | 443 | 392 | 355 | 37 | 51 | 0 | 88.5% | 80.1% |
| CD | District | Expected | With Submission | Complete | In Progress | Missing | Overdue | Submission % | Completion % |
|---|---|---|---|---|---|---|---|---|---|
| 3 | Anda | 19 | 18 | 16 | 2 | 1 | 0 | 94.7% | 84.2% |
| 3 | Batuan | 18 | 1 | 0 | 1 | 17 | 0 | 5.6% | 0% |
| 3 | Carmen 3 | 13 | 11 | 7 | 4 | 2 | 0 | 84.6% | 53.8% |
| 3 | Jagna | 32 | 23 | 13 | 10 | 9 | 0 | 71.9% | 40.6% |
| 3 | Loboc | 19 | 16 | 12 | 4 | 3 | 0 | 84.2% | 63.2% |
| 3 | Mabini | 28 | 15 | 8 | 7 | 13 | 0 | 53.6% | 28.6% |
| 3 | Sevilla | 23 | 17 | 16 | 1 | 6 | 0 | 73.9% | 69.6% |
| 3 | Alicia | 21 | 21 | 17 | 4 | 0 | 0 | 100% | 81% |
| 3 | Candijay | 28 | 28 | 26 | 2 | 0 | 0 | 100% | 92.9% |
| 3 | Garcia Hernandez | 23 | 23 | 21 | 2 | 0 | 0 | 100% | 91.3% |
| 3 | Bilar | 20 | 20 | 20 | 0 | 0 | 0 | 100% | 100% |
| 3 | Carmen 1 | 15 | 15 | 15 | 0 | 0 | 0 | 100% | 100% |
| 3 | Carmen 2 | 16 | 16 | 16 | 0 | 0 | 0 | 100% | 100% |
| 3 | Dimiao | 18 | 18 | 18 | 0 | 0 | 0 | 100% | 100% |
| 3 | Duero | 25 | 25 | 25 | 0 | 0 | 0 | 100% | 100% |
| 3 | Guindulman | 24 | 24 | 24 | 0 | 0 | 0 | 100% | 100% |
| 3 | Lila | 11 | 11 | 11 | 0 | 0 | 0 | 100% | 100% |
| 3 | Loay | 14 | 14 | 14 | 0 | 0 | 0 | 100% | 100% |
| 3 | Pilar | 24 | 24 | 24 | 0 | 0 | 0 | 100% | 100% |
| 3 | Sierra Bullones | 26 | 26 | 26 | 0 | 0 | 0 | 100% | 100% |
| 3 | Valencia | 26 | 26 | 26 | 0 | 0 | 0 | 100% | 100% |
| CD | District | School | QRA / Results Analysis | CIMR | Learning Competency Audit | Multifactor Analysis | Overall Status |
|---|---|---|---|---|---|---|---|
| 3 | Anda | Anda Central Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Batuan Central Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Batuan Central Elementary School Annex | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Batuan National High School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Behind the Clouds Primary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Bonifacio Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Cabacnitan Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | CAMBACAY ELEMENTARY SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Cantigdas ELementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Garcia Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Janlud Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Lungsod-Daan Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | QUEZON ELEMENTARY SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Quirino Primary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Rizal Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | RIZAL HIGH SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Rosariohan Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Batuan | Sta. Cruz Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Carmen 3 | EL PROGRESO ELEM SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Carmen 3 | Valeriano Segura Memorial Elem. School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Jagna | BUNGA ILAYA ELEMENTAQRY SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Jagna | Buyog Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Jagna | C | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Jagna | CA | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Jagna | Faraon National High School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Jagna | JA | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Jagna | KINAG | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Jagna | Lonoy Heroes Memorial High School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Jagna | TMIS-ELEM. | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Loboc | JIMILIAN PRIMARY SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Loboc | Loboc Central Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Loboc | Triple Union Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | Abaca Integrated School - Secondary | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | Baybayon Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | Bulawan Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | Concepcion National High School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | LUNGSODAAN ELEMENTARY SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | Marcelo Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | MINOL ELEMENTARY SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | Paraiso Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | SAN ISIDRO ELEMENTARY SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | SAN JOSE HIGH SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | San Roque Elementary School | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | SAN ROQUE NATIONAL HIGH SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Mabini | VALAGA ELEMENTARY SCHOOL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Sevilla | BAYAWAHAN ELEM. SCHOOLhool | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Sevilla | CAMBAGUI ELEMENTARY SCHOOLL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Sevilla | CAMBAGUI ELEMENTARY SCHOOLLL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Sevilla | CCAMBAGUI ELEMENTARY SCHOOLL | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Sevilla | Lagtangan Elementary Schoolcf | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
| 3 | Sevilla | SE | ✕ NONE | ✕ NONE | ✕ NONE | ✕ NONE | NO SUBMISSION Reason: QRA / Results Analysis: no submissionReason: CIMR: no submissionReason: Learning Competency Audit: no submissionReason: Multifactor Analysis: no submission Missing Plan / Intervention does not block COMPLETE; a submitted but partial Plan can still require completion. |
After the deadline, a school with no submission is automatically marked OVERDUE.